1
/
of
7
Hsscblet
5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
5 Tiers Metal Shoe Rack,Adjustable Shoe Shelf Storage Organizer with Hooks,Stackable Boot & Shoe Storage,for Entryway,Hallway,Closet,Black
Regular price
$57.41
Regular price
Sale price
$57.41
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
About This
- Sturdy and Durable Metal: The 5 tiers shoe rack is made of sturdy and smooth powder coated metal tubing with corrosion resistant and high quality plastic connectors. Stable, each shelf can hold up to 11 pounds and has a long service life.
- More large space:This expandable shoe rack holds up to 20 pairs of shoes. You can remove one layer to put boots or other large items. Besides shoes, this modern shoe racks can hold hats, books, bags, small accessories, and sundries for maximize your space!
- Multifunctional: The black shoe rack cabinet has hanging hooks that allow you to hang commonly used items on the side hooks such as umbrellas, belts, keys, bags, hats, shopping bags, rackets, etc
- Product Dimension: The size of 35.6"x12.2"x35.03",Put in the kitchen can be placed in the kitchen utensils and tableware. In the entrance can keep clean and tidy. The shelf in the bedroom can put miscellaneous things in the closet to keep clothes neat and tidy. Make the miscellaneous room look cleaner.
- EASY TO ASSEMBLE: No tools needed,Free standing shoe racks includes instruction manual,You can have it assembled about 5 minutes, if you have any questions about the process, please do not hesitate to contact us at any time
Overview
- Room Type : Bedroom, Closet, Hallway
- Number of Shelves : 5
- Special Feature : Adjustable
- Product Dimensions : 35.6"D x 12.2"W x 35.03"H
- Style : Modern,Adjustable,Versatile
- Finish Type : Powder Coated
- Brand : Hsscblet
- Product Care Instructions : Wipe with Dry Cloth
- Size : 5-Tier
- Weight Limit : 11 Pounds
- Material Metal : Mounting Type Floor Mount
- : Material Metal
- : Mounting Type Floor Mount
- Shelf Type Tiered Shelf : Shape Rectangular
- : Shelf Type Tiered Shelf
- : Shape Rectangular
Share
